Installation

The installation instructions for the Hops Cave provide a clear DIY guide. Here’s a brief breakdown to simplify the steps:

Installation Process:

  1. Digging the Hole:

    • Dig a hole 20 cm wide and 95 cm deep.
    • It’s recommended to use an auger for this.
    • Ensure no underground cables are present before starting.
    • Choose a shaded spot for better cooling.
  2. Placing the Tube:

    • Insert the stable cladding tube into the hole.
    • The tube has a watertight bottom and flotation control to prevent it from rising due to high water levels.
    • Fill the rest of the hole with soil and wash it in with water to stabilize the tube.
  3. Adding Beverages:

    • Fill the beverage holder with up to 15 bottles (up to 0.5L each).
    • Lower the holder into the tube.
    • For the Hops Cave Lift version, insert the lift, place the holder onto the damper, push it down, and lock it by pushing and turning.

Putting it into Operation:

  1. Closing the Hops Cave:
    • Place the thermally insulated UV-resistant lid on top.
    • Ensure the sealing ring is properly in place to prevent vermin or water from entering.
    • Insert the valve lid and secure it tightly.
  2. Using and Maintaining:
    • The Hops Cave lid is strong enough to mow over once sealed.
    • To open, remove the valve lid before the main lid for easy access.

Once installed, the Hops Cave should remain firmly in the ground and ready to cool your beverages!